A booklet with all the entries submitted to the juri was done. Further informations about the winners at http://www.steelconstruct.com/
List of the entries submitted
bridge name |
key file |
image |
Gustave Flaubert lifting bridge
Certificate of Excellence on Road, Highway and Railway bridges category |
Type: Highway Location: Rouen, France Completion Date: Mar-07 Owner: Ministère de l’Equipement, des Transports et du Logement represented by the Préfecture de Seine-Maritime Architecture: Zublena Architecte PLG Engineering: Grouepement Arcadis - Eurodim - Virlogeux General Contractor: DDE Rouen Steel Fabricator: Victor Buyck Steel Construction n.v., Eiffel CM |
![]() ![]() |
| Type: Highway Location: Monestier de Clermont, France Completion Date: Out-06 Owner: AREA Architecture: Cabinet Strates Engineering: Ingérop Steel Fabricator: Baudin Chateauneuf and Berthold SA |
![]() |
|
| Type: Roadway Location: Audicourt and Valentigney, France Completion Date: Jan-08 Owner: Communaute d'Agglomeration du Pays de Montbeliard Architecture: Cabinet Architecture et Ouvrages d'Art Engineering: EGIS JMI Steel Fabricator: Baudin Chateauneuf and Berthold SA |
![]() |
|
| Type: Railway Location: Eefde, The Netherlands Completion Date: Dec-05 Owner: ProRail Regio Noord-Oost Architecture: StudioSK Engineering: Movares Nederland Steel Fabricator: Hollandia BV |
![]() |
|
| Type: Highway Location: Parma, Italy Completion Date: Jun-05 Owner: Comune di Parma Architecture: A.I.Erre Engineering S.r.l Engineering: Prof. Ing. Pier Giorgio Malerba Steel Fabricator: Cordioli & C Spa |
![]() |
|
Extending the Lifespan of the Luiz I Bridge
Certificate of Merit on Road, Highway and Railway bridges category |
Type: Railway (in addition to existing Roadway) Location: Porto, Portugal Completion Date: Sep-05 Owner: Metro do Porto SA Engineering: Grid SA General Contractor: Soares da Costa SA Steel Fabricator: Socometal |
![]() |
| Type: Footbridge Location: Copenhagen, Denmark Completion Date: Mar-08 Owner: Municipality of Copenhagen Architecture: Dissing + Weitling Engineering: Niras General Contractor: Barslund A/S Steel Fabricator: Bladt Industries A/S |
![]() |
|
Certificate of Nomination on Road, Highway and Railway bridges category |
Type: Railway Location: HSRL Córdoba-Málaga, Spain Completion Date: Mar-06 Owner: ADIF Engineering: IDEAM SA General Contractor: ALTEC Steel Fabricator: Megusa |
![]() |
| Type: Highway Location: Vitoria, Basque Country, Spain Completion Date: Feb-07 Owner: Municipality of Vitoria Engineering: Pedelta SL Steel Fabricator: Joint Venture DRAGADOS AND URSSA |
![]() |
|
| Type: Railway Location: Sant Boi, Catalonia, Spain Completion Date: Feb-08 Owner: ADIF Engineering: Pedelta SL Steel Fabricator: ACCIONA |
![]() |
|
| Type: Roadway Location: Dresden, Germany Completion Date: Jul-05 Owner: Federal Republic of Germany Architecture: Leonhardt, Andrä und Partner Engineering: Leonhardt, Andrä und Partner Steel Fabricator: Stahlbau Plauen |
![]() |
|
| Type: Highway Location: Puig Reig, Barcelona,Spain Completion Date: Dec-07 Owner: GISA Architecture: Cesma Ingenieros SL Engineering: Cesma Ingenieros SL Steel Fabricator: ITURMO |
![]() |
|
| Type: Cyclebridge Location: Amsterdam, The Netherlands Completion Date: Jun-06 Owner: Gemeente Amsterdam Architecture: Wilkinson Eyre Architects Engineering: Ove Arup & Partners Ltd General Contractor: Van Slpunder Steel Fabricator: Hollandia BV |
![]() |
|
| Type: Roadway Location: Swansea, UK Completion Date: Nov-07 Owner: City & Country of Swansea Architecture: Studio Bednarski Ltd Engineering: Flint & Neill Partnership General Contractor: Alun Griffiths Ltd Steel Fabricator: Rowecord Enginneering Ltd |
![]() |
|
| Type: Roadway Location: Podpec, Slovenia Completion Date: Oct-07 Owner: Direkcija Republike Slovenije Za Ceste Architecture: Prof. Peter Gabrijelcic Engineering: IMK Ljubljana General Contractor: Gradis GP Ljubljana d.o.o Steel Fabricator: Tosin d.o.o. |
![]() |
|
| Type: Footbridge Location: Mauerbachsteg, Austria Completion Date: Nov-06 Owner: City of Vienna Architecture: Albert Wimmer ZT GmbH Engineering: Pauser ZT GmbH Steel Fabricator: Zublin Bau-GmbH |
![]() |
|
| Type: Highway Location: Halle-Saale, Germany Completion Date: Dec-05 Owner: Town of Halle/Saale, Tiefbauamt Architecture: Architekturbüro U. Graul Engineering: Grassl Beratende Ingenieure Bauwesen Magdeburg Steel Fabricator: Donges Stahlbau GmbH |
![]() |
|
| Type: Footbridge Location: Drammen, Norway Completion Date: Jan-08 Owner: Drammen Kommune Architecture: ARNE EGGEN ARKITEKTER Engineering: HAUG OG BLOM-BAKKE AS Steel Fabricator: RUUKKI CONSTRUCTION NORGE AS |
![]() |
|
| Type: Cyclebridge Location: Copenhagen, Denmark Completion Date: Aug-06 General Contractor: E. Pihl & Søn A/S Steel Fabricator: VSB Industri A/S |
![]() |
|
| Type: Roadway Location: Dubai, United Arab Emirates Completion Date: Nov-07 Owner: Roads and Transport Authority Engineering: Waagner Biro Gulf LLC General Contractor: Waagner Biro Gulf LLC Steel Fabricator: Waagner Biro Gulf LLC |
![]() |
|
| Type: Highway Location: Schleusingen, Germany Completion Date: Dec-06 Owner: Deges GmbH Engineering: Weyer Beratende Ingenieure GmbH Steel Fabricator: MCE Stahl und Maschinenbau GmbH & Co |
![]() |
|
| Type: Footbridge Location: between Weil am Rhein, Germany, and Huningue, France, across the Rhine River Completion Date: Mar-07 Owner: City of Weil am Rhein Architecture: Feichtinger Architectes Engineering: Leonhardt, Andrä und Partner, Consulting Engineers VBI, GmbH Steel Fabricator: Max Bögl |
![]() |
Operation of the Awards
The Awards are open to steel and composite bridges whose steel structures were fabricated in the Full ECCS member countries (list available at www.steelconstruct.com). The construction must have been completed and be ready for use within the last three years, in the period between the 31st May 2005 and the 31st May 2008. Previous entries are not eligible. Both bridges, footbridges and renovation (major retrofit, expansion or rehabilitation) projects are eligible.
The Panel of Judges
A panel of judges comprising prominent representatives of Architecture and Civil Engineering will assess the entries:
• Bertrand Lemoine;
• Joël Raoul;
• Julio Martínez Calzón;
• L. Simões da Silva;
• Paulo J. S. Cruz;
• René Maquoi.
The judging panel selects award winners after assessing all entrants against the following criteria:
• To be of an internationally recognised standard;
• To be outstanding in its construction;
• To emphasise the advantages of steel in construction, production,
economy and architecture;
• To disseminate the knowledge of steel, its many uses, and to draw
attention to its development;
• To improve the image of steel.
• To interest clients, architects and engineers in using more steel
within the entire building sector, thereby making the steel industry competitive;
The judging will take place in March and the Jury's decision will be known before 15th May 2008. The General Secretariat will inform the National Association members who have submitted an entry of the decision.
The Awards
The winner(s) will receive a trophy and the nominees a certificate. The owner(s) of the structures and the architects responsible for the design receive an Award as do the engineers and the steelwork contractors.
The Award will be presented during the 7th International Conference on Steel Bridges that will be held in Guimarães, Portugal, June 4-6, 2008, at the Campus of Azurém of the University of Minho (www.steelbridges08.com).
Submission of Entries
The entries must be approved by the National Associations (NAM). The projects have to be sent to the organising association (cmm, Portugal) before the 29 February 2008.
The entries will contain the necessary design drawings, description and photographs of the steel structures in 3 copies.
General descriptions and photographs of these projects may be used for publications and articles in the press. Application for an European Steel Bridge Award automatically means agreement that ECCS and/or the full members of ECCS may use the material presented to ECCS for all purposes relating to the aims of ECCS.
Deadlines
15th March 2008 •Submission of Entries (Extended)
- Done!
30th March 2008 •Jury Decision Notification - Done!
15th May 2008 •Finalists Presentation/Movies Submission
6th June 2008 •Awards Ceremony
Submittal Requirements
The entire entry should be contained within one binder accompanied by an application form.
1- Entry cover letter must include:
• Name and location of project (name of firm submitting entry, address,
person to contact, phone, fax and e-mail);
• Name and location of structural engineering firm, architectural firm,
general contractor, project owner. Download
the ENTRY FORM
2- Project Description: Include a description of the owner's/architect's building programme, an explanation of how the structures satisfies the programme and distinguishing/unique aspects of the structural system and aesthetic considerations.
3- Photographs: A set of 5 to 12 high definition photographs*, ready for publication, of both construction and the completed project must be included, preferably on jpg, tif or eps format. Rights to photos, slides and plans must be cleared for presentation and publication (booklet and website) by the entrant. Any fees or royalties connected with such releases are the responsibility of the entrant. ECCS reserves the right to free use of all photos and materials submitted for promotional purposes.
4- Drawings: Provide a site plan, and general arrangement. In addition, show typical and innovative details. All drawings should be reduced to A4 format.
5- CD-ROM: Power Point presentation limited to 10 slides or a Movie limited to 5 min.
* 300 dpi resolution, format 16x24